Album
5

2024: LeesGreen BWTS Turnkey Project for MV Orkim Power at Singapore Shipyard
3

2024: Supporting AIREI in Pioneering Design & Build for the World’s First AI-Driven Palm Oil Mill
7

2024: Turnkey Installation Services for BWTS on LNG Berge Arzew at Shipyard in Spain
1

“LeesGreen” IMO Approved Ballast Water Management system
10

Alfa Laval Pureballast BWTS installation
16

Headway BWTS Installation
25

Sunrui BWTS installation
4

10" Cooling Tower Water Supply & Return Pipeline
6

500TPD CPO Washing & Pretreatment Plant
7

Ballast Water Treatment System Installation
41

Blue Ocean Shield BWTS
2

Busbar Modification
7

Cable Pulling & Cable Laying
9

Cable Termination & Cable Dressing
4

Cable Tray Installation
8

Delivery
3

Electrical Hydraulic Valve Control Panel Installation
6

ELECTRICAL WORKS
2

Flow Meter Installation
4

Heat Exchanger Cleaning & Maintenance
9

IGG Modification on LNG Tanker
6

Installation of Alfa Laval PureSox Scrubber System
6

Insulation Work ( Vessel , Tank , Piping )
5

Large Flowmeter Replacement
3

Lifting Methanol Column
3

On-Site Main Switchboard (MSB) Modification
3

Orbital Welding
4

Roof & Cladding Installation
1

Site Installation
7

Stainless Steel Pipe Installation
3

Steam Tracing
7

UV Sterilizer Installation & Commissioning