10" Cooling Tower Water Supply & Return Pipeline
1
“LeesGreen” IMO Approved Ballast Water Management system
10
Alfa Laval Pureballast BWTS installation
16
Headway BWTS Installation
25
Sunrui BWTS installation
6
500TPD CPO Washing & Pretreatment Plant
7
Ballast Water Treatment System Installation
41
Blue Ocean Shield BWTS
2
Busbar Modification
7
Cable Pulling & Cable Laying
9
Cable Termination & Cable Dressing
4
Cable Tray Installation
8
Delivery
3
Electrical Hydraulic Valve Control Panel Installation
6
ELECTRICAL WORKS
2
Flow Meter Installation
4
Heat Exchanger Cleaning & Maintenance
9
IGG Modification on LNG Tanker
6
Installation of Alfa Laval PureSox Scrubber System
6
Insulation Work ( Vessel , Tank , Piping )
5
Large Flowmeter Replacement
3
Lifting Methanol Column
3
On-Site Main Switchboard (MSB) Modification
3
Orbital Welding
4
Roof & Cladding Installation
1
Site Installation
7
Stainless Steel Pipe Installation
3
Steam Tracing
7
UV Sterilizer Installation & Commissioning