Headway BWTS Installation

Other Album

“LeesGreen” IMO Approved Ballast Water Management system

“LeesGreen” IMO Approved Ballast Water Management system

10 

Alfa Laval Pureballast BWTS installation

Alfa Laval Pureballast BWTS installation

25 

Sunrui BWTS installation

Sunrui BWTS installation

10" Cooling Tower Water Supply & Return Pipeline

10" Cooling Tower Water Supply & Return Pipeline

500TPD CPO Washing & Pretreatment Plant

500TPD CPO Washing & Pretreatment Plant

Ballast Water Treatment System Installation

Ballast Water Treatment System Installation

41 

Blue Ocean Shield  BWTS

Blue Ocean Shield BWTS

Busbar Modification

Busbar Modification

Cable Pulling & Cable Laying

Cable Pulling & Cable Laying

Cable Termination & Cable Dressing

Cable Termination & Cable Dressing

Cable Tray Installation

Cable Tray Installation

Delivery

Delivery

Electrical Hydraulic Valve Control  Panel Installation

Electrical Hydraulic Valve Control Panel Installation

ELECTRICAL WORKS

ELECTRICAL WORKS

Flow Meter Installation

Flow Meter Installation

Heat Exchanger Cleaning & Maintenance

Heat Exchanger Cleaning & Maintenance

IGG Modification on LNG Tanker

IGG Modification on LNG Tanker

Installation of Alfa Laval PureSox Scrubber System

Installation of Alfa Laval PureSox Scrubber System

Insulation Work ( Vessel , Tank , Piping )

Insulation Work ( Vessel , Tank , Piping )

Large Flowmeter Replacement

Large Flowmeter Replacement

Lifting Methanol Column

Lifting Methanol Column

On-Site Main Switchboard (MSB) Modification

On-Site Main Switchboard (MSB) Modification

Orbital Welding

Orbital Welding

Roof & Cladding Installation

Roof & Cladding Installation

Site Installation

Site Installation

Stainless Steel Pipe Installation

Stainless Steel Pipe Installation

Steam Tracing

Steam Tracing

UV Sterilizer Installation & Commissioning

UV Sterilizer Installation & Commissioning